How to Run a 60-to-90-Day Staffing Pilot Your Board Trusts

Run a 60-to-90-day staffing pilot a school board will trust: one whole program area, a week-one baseline, four measures, and a close that is a decision.

Boards approve pilots all the time and trust few of them. The reason is usually the same. The pilot was announced with enthusiasm, ran for a semester, and came back with a story instead of a comparison. Nobody wrote down how things worked before, so nobody could say what changed.

A staffing pilot is easier to design well than most, because staffing produces records: requests, submissions, approvals, start dates, timesheets. This post walks through how to design a 60-to-90-day pilot of a managed staffing program so the board gets a comparison it can check and a decision it can make.

1. Pick one whole program area

Scope is the first decision and the one that most affects whether the result is readable.

One whole program area where more than one agency fills the roles. All of special education is a good first scope: the paraprofessionals, the related services and every other role your agencies supply to that program. Pupil services, transportation and food service follow on your schedule. At a single-campus charter school, one program area may be the whole agency spend, and that is a complete pilot too. You can also start with everything your agencies supply.

Openings expected in the window. A pilot with no openings proves nothing. Pick a scope where you expect needs to arise during the 60 to 90 days, from turnover, leave or caseload changes.

Everything else unchanged. Every other program area keeps working with its agencies exactly as it does today. Your agencies, your requirements and your hiring decisions stay yours inside the pilot too. The only thing that changes is who runs the agencies for that one scope.

Your contact. Name one contact for the whole pilot, or one for each department or program inside it, who can approve candidates and timesheets. The report is written for them.

2. Take the baseline in week one

The baseline is what makes the pilot believable. Without it, the board is comparing the pilot to a memory.

Take it in week one, before the first opening is released, from your own recent openings in the same scope. For each measure below, write down how it works today:

Some of these will be estimates. That is fine, as long as they are written down before the pilot starts and the board sees them labeled as estimates. If you want a firmer number for staff effort, run a two-week tally of touches before the pilot, as described in what agency coordination costs.

Week one is also setup: your roles, the rate range your office approves for each role, and your required documents are loaded, and the agencies you already use for that scope are onboarded.

3. Report four measures

Keep the list short. A board can absorb four measures; it cannot absorb fourteen. These are the four on the pilot page, with the before and during for each.

Time to first qualified submission

Before: your estimate from recent openings. During: opening released to first candidate who meets your requirements, because every approved agency is working it at the same time.

Time to cleared start

Before: your estimate. During: opening released to first day worked, with every required document reviewed and approved.

Touches per filled opening

Before: the calls, emails, and chases your staff make to fill one opening today. During: the same count under the pilot, when the chasing is ours.

Where each opening stands

Before: who you have to call to learn an opening's status. During: whether your contact can see every opening's status without asking anyone.

During the pilot, the numbers come from the program record, not from recollection: every release, submission, approval and status change carries a timestamp. That is the part a board can trust. It is not the operator's account of how the pilot went. It is the record, summarized against the baseline your district wrote down in week one.

Notice what is not on the list: a fill rate promise, a savings figure, a projection. The pilot measures what happened in your district, in your scope, with your agencies.

4. Run it on a calendar

A pilot that drifts is hard to judge. Put the calendar in front of the board when you ask for approval.

When What happens
Week 1 Baseline and setup: how the program area is staffed today; roles, rate ranges and required documents loaded; your agencies onboarded
Week 2 First opening released to every approved agency at the same recorded time; we review and approve the first file
Weeks 3 to 8 The program runs: openings, approvals, hours, and one invoice per period
Week 9 Your numbers, side by side: a before-and-after report built from your own record

Two rules hold for the whole window. No start date can be set while any required document is missing or still awaiting review. And only hours your schools approve on screen reach the invoice.

5. Close with a decision

The end of a pilot is not a presentation. It is a decision, and there are only three options:

Ask for the decision in the original board item, so the close is already on the calendar. The report goes to the board whether the recommendation is continue, expand or stop.

6. Make sure there is nothing to unwind

A board is more willing to approve a pilot when stopping is cheap. Check that these hold before you start:

What the board memo should say

Keep it to one page:

  1. Scope: the program area, and the window.
  2. Baseline: the four measures as they stand today, labeled as estimates where they are.
  3. Measures at close: the same four, from the program record.
  4. Cost: none to the district.
  5. Decision date: when the board will hear the report and choose continue, expand or stop.

The transition guide has the approval paths and a shared timeline, and how it works shows each step of the program. A fifteen-minute walkthrough built around one of your real openings answers most of the rest.

Frequently asked questions

Why 60 to 90 days?

Long enough for openings in one program area to move from request to start, and for at least one invoice cycle to close; short enough that the board hears the result in the same school year it approved the pilot.

What if no openings come up during the pilot?

Choose a scope where openings are expected in the window. If volume is lower than expected, the report says so, and the board can extend the same scope rather than judging on too few openings.

Who writes the baseline?

The district, in week one, from its own recent openings, with the operator's help. Estimates are labeled as estimates. What matters is that the baseline is written down before the pilot starts.

What happens to agency relationships if we stop?

Nothing has to be undone. Your agencies keep their agreements with you, and the program area returns to how it ran before.

Talk to the person who would run it. A walkthrough is 15 minutes on your roles and your agencies, with the platform open.

Book your 15 minutes

Next step

Talk to the person who would run your program.

Fifteen minutes on your roles, the rates you pay today and the agencies you already use, with the program open. No slides, no obligation, and no cost to your district.

What we cover

  1. How your district manages its agencies today.
  2. Candidate review, document approval and billing, on a case like yours.
  3. Where to start: everything your agencies supply, or one whole program area such as all of special education.

You leave with a clear next step. Nothing is signed on the call.

Book your walkthrough